Customization: | Available |
---|---|
Type: | Chemical Hardening Sand |
Casting Method: | Thermal Gravity Casting |
Still deciding? Get samples of US$ 3.5/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The bimetal wear-resistant hammerhead produced by our company adopts the lost foam double-liquid compound casting process, which is cast in one time. The hammer head part is made of high chromium alloy, the hardness can reach HRC62 or more, and a large amount of precious and rare alloys are added to resist severe abrasive wear and have good wear resistance. The hammer handle part is made of high toughness low alloy manganese steel material, which has good The toughness of the hammer is not easy to break, and the two alloy liquids are compounded to avoid the problems of easy falling off and non-wearing of the mosaic type, so that the hammer can meet the requirements of toughness and wear resistance at the same time. It has been used in hundreds of cement and mining enterprises. Well received by customers. The service life of the bimetal hammers produced is longer than that of high manganese steel, which can improve the pulverization efficiency. The important thing for the crushed materials is the wear resistance of the hammers. The bimetal hammers cast by our company are produced by using alloy hammers. The hammer is especially suitable for materials such as highly abrasive limestone with high silicon content and poor breakability, and is highly praised by many large-scale cement production lines and sandstone users. | |||||||||
Packaging & Shipping
Trade Terms |
FOB,EXW,CIF |
Port |
Shanghai |
Shipment |
By sea,by express or by air |
Payment Terms |
L/C,TT,Paypal,West Union |
Payment Condition |
30% before production, 70% before delivery |
Supply Capability |
10,000 tons per year |
Sample Availability |
Yes |
Sample Time |
15-30 Days |
Packing |
Plywood Cases or Steel Crates |
Delivery time |
45 days per 20 tons regular casting products |
Service |
OEM, ODM or Customized |