1. Name:Sintered Bronze Bushing
2.Materials:Bronze
3.Dimension:OEM according to your request
Specification: |
|
MATERIAL |
1.Bronze;Fe-Cu; MPIF standard F-0000-K23 ; FC-0200 ; FG-0303 SERIES
2.OEM According to your request |
WORKING TEMPERATURE: |
-40ºC ~ +200ºC |
DENSITY & GRAVITY: |
6.4-7.3g/cm3 |
OIL IMPREGNATION RATE: |
15% - 23% |
GRAPHITE CONTENT RATE: |
1% - 3%Max |
SLIDING SPEED: |
6.0 [m/s] |
LOAD CAPACITY STATIC: |
10 N/mm2 |
MAXIMUM PV VALUE: |
1.6 N/mm2•m/s |
LOAD CAPACITY DYNAMIC: |
5 N/mm2 |
WORKING SPEED: |
2.5 m/s |
TYPE OF SHAPE: |
Cyclinder ; Flange ;Spherecial (with Ring) |
FOR LOAD DIRECTION: |
Radial , Thrust, Combined Radial and Thrust |
YIELD STRENGTH: |
15000 PSI |
SHAFT MOUNT TYPE: |
Press Fit |
Taper Bushings (Metric Bore) |
Taper Bushings (Inch Bore) |
NO. |
Bore Range |
|
NO. |
Bore Range |
|
|
MIN. |
MAX. |
|
MIN. |
MAX. |
1008 |
9 |
25 |
1008 |
3/8 |
1 |
1108 |
9 |
28 |
1108 |
3/8 |
1 1/8 |
1210 |
11 |
32 |
1210 |
1/2 |
1 1/4 |
1215 |
11 |
32 |
1215 |
5/8 |
1 1/4 |
1310 |
14 |
35 |
1310 |
1/2 |
1 3/8 |
1610 |
14 |
42 |
1610 |
1/2 |
1 5/8 |
1615 |
14 |
42 |
1615 |
1/2 |
1 5/8 |
2012 |
14 |
50 |
2012 |
5/8 |
2 |
2017 |
18 |
50 |
2017 |
3/4 |
2 |
2517 |
16 |
60 |
2517 |
3/4 |
2 1/2 |
2525 |
18 |
60 |
2525 |
7/8 |
2 1/2 |
3020 |
25 |
75 |
3020 |
1 1/4 |
3 |
3030 |
35 |
75 |
3030 |
1 1/4 |
3 |
3525 |
35 |
90 |
3525 |
1 1/2 |
3 1/2 |
3535 |
35 |
90 |
3535 |
1 1/2 |
3 1/2 |
4030 |
40 |
100 |
4030 |
1 3/4 |
4 |
4040 |
40 |
100 |
4040 |
1 3/4 |
4 |
4535 |
55 |
110 |
4535 |
2 1/4 |
4 1/2 |
4545 |
55 |
110 |
4545 |
2 1/4 |
4 1/2 |
5040 |
70 |
125 |
5040 |
2 3/4 |
4 1/2 |
5050 |
70 |
125 |
5050 |
3 |
5 |
QD Bushings |
NO. |
WEIGHT
(KG) |
Bore Range |
Min. |
Max. |
JA |
0.36 |
3/8 |
1 1/4 |
SH |
0.45 |
1/2 |
1 11/16 |
SDS |
0.54 |
1/2 |
2 |
SD |
0.68 |
1/2 |
2 |
SK |
0.91 |
1/2 |
2 5/8 |
SF |
1.59 |
1/2 |
2 15/16 |
E |
4.08 |
7/8 |
3 1/2 |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment
irrevocable LC at sight.