• Deflector Liner Feed Head Steel Liners Sag Mill Liner
  • Deflector Liner Feed Head Steel Liners Sag Mill Liner
  • Deflector Liner Feed Head Steel Liners Sag Mill Liner
  • Deflector Liner Feed Head Steel Liners Sag Mill Liner
  • Deflector Liner Feed Head Steel Liners Sag Mill Liner
  • Deflector Liner Feed Head Steel Liners Sag Mill Liner

Deflector Liner Feed Head Steel Liners Sag Mill Liner

Casting Method: Thermal Gravity Casting
Application: Sag Mill
Material: High Manganese Steel
Surface Treatment: Sand Blast
Standard: ASTM
Certification: ISO 9001:2008
Samples:
US$ 3.8/kg 1 kg(Min.Order)
| Request Sample
Customization:

Contact Supplier

Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
EB863
Transport Package
Plywood Case
Trademark
EB
Origin
China
Production Capacity
500000kilograms/Year

Product Description

Deflector Liner Feed Head Steel Liners Sag Mill Liner

1.Material:High Manganese Steel

2.Material Grade:AS 2074 L2A/L2B/L2C

3.Dimensions:as per drawings

4.Application:Copper Mine

5.Special Features:

5-1.The material of SAG mill liners are low C or high C Cr-Mo Alloy steel,which depends on the specific working condition

of the SAG mill.

5-2.The hardness of AS2074 L2B is HB310-HB380.

5-3. We can make big size SAG mill liner castings with Sodium Silicate Sand Process & Resin Sand Process.

5-4. We can supply alloy steel SAG mill liner castings with proper heat-treatment process.

5-5. We can produce Cr-Mo alloy steel SAG Mill castings as per AS2074 L2B, L2C, GB/T 26651-2011.

5-6. Metallographic structure of AS2074 L2B/L2C Steel is Pearlitic.

6. Chemical Composition:

Material Grade

C

Si

Mn

P

S

Cr

Mo

AS2074 L2B

0.55-0.65

<0.75

0.50-1.00

<0.06

<0.06

0.80-1.50

0.20-0.40

AS 2074 L2C

0.70-0.90

<0.75

0.50-1.20

<0.06

<0.06

1.30-2.40

0.20-0.40

Deflector Liner Feed Head Steel Liners Sag Mill Liner
Deflector Liner Feed Head Steel Liners Sag Mill Liner
Deflector Liner Feed Head Steel Liners Sag Mill Liner
Deflector Liner Feed Head Steel Liners Sag Mill Liner
Q: Are you trading company or manufacturer ? 
A: We are factory. 

Q: How long is your delivery time? 
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity. 

Q: What is your terms of payment ? 
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.
irrevocable LC at sight.

Send your message to this supplier

*From:
*To:
avatar Ms. Julia Zhu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now