• ASTM Seamless Rolled Stainless Steel Tubes
  • ASTM Seamless Rolled Stainless Steel Tubes
  • ASTM Seamless Rolled Stainless Steel Tubes
  • ASTM Seamless Rolled Stainless Steel Tubes
  • ASTM Seamless Rolled Stainless Steel Tubes
  • ASTM Seamless Rolled Stainless Steel Tubes

ASTM Seamless Rolled Stainless Steel Tubes

Machining: Machining Center
Material: Stainless Steel
Surface Treatment: Polishing
Standard: ASTM
Certification: ISO 9001:2008
Transport Package: Plywood Case
Samples:
US$ 6.5/kg 1 kg(Min.Order)
| Request Sample
Customization:
Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (14)

Basic Info.

Model NO.
EB3378
Trademark
EB
Origin
China
Production Capacity
500000kilograms/Year

Product Description

ASTM Seamless Rolled Stainless Steel Tubes

Product Description:

Items Name

Seamless Rolled Stainless Steel Tube Pipe Hollow Bar EB3378

Service

OEM ODM Service

Standard

Seamless Rolled

Surface treatment

Sand Blasting

Application

Industry

Dimensions 

As per drawing

Process type

Casting. Deburring .Drilling .threading

Packing Details

Plywood Case

Material Grade: Stainless Steel,Alloy Steel, Non-magnetic Steel, Carbon Steel,Non-ferrous

Production Process: Open Die Forging Process

Section Thickness: Up to 800mm;

Length max.: 3500mm.

Product Types: Step shaft forgings,excentric shaft,roller forgings,rod and bar blank forgings,valve body forging,gear wheel

forgings, gear rings,vehicle wheel forgings,oil cylinder forgings,offset axis.

Unit Weight: 400kg ~ 50000kg.

Production Facilities:

Electric-hydraulic hammers with capacity 8 tons,6 tons,3 tons;

Feeding Machines with capacity 10 tons, 5 ton;

Heat-treatment Furnaces: 5 sets;

Disc Type Band Saws: 6 sets;

Machining Facilities: 3 sets.

Annual Capacity with Open Die Forging Process: 30,000tons.

ASTM Seamless Rolled Stainless Steel Tubes
ASTM Seamless Rolled Stainless Steel Tubes
ASTM Seamless Rolled Stainless Steel Tubes
ASTM Seamless Rolled Stainless Steel Tubes 
Q: Are you trading company or manufacturer ? 
A: We are factory. 

Q: How long is your delivery time? 
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity. 

Q: What is your terms of payment ? 
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment.
irrevocable LC at sight.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14000, ISO 20000
Terms of Payment
LC, T/T